Myanmar – China Boundary was demarcated during the year 1959 to 1961. It was known as “Ba Ba Campaign”. In 1985-1986 field season, first phase of joint inspection of Myanmar- China boundary was done for 106 boundary pillars and necessary Additional Boundary Pillars were constructed. Second phase of joint inspection of Myanmar- China boundary for 498 boundary pillars was done during 1993- 1994 field season. Ground Control Point surveying for the total length of 1384 miles of Myanmar – China entire boundary was carried out during the 1993-1994 field season and aerial photography, vectorization and map production were also carried out.
The Joint inspection and construction of Myanmar – China Boundary
Sr. |
Categories |
Location |
Field season |
|
From |
To |
|||
1 |
Joint inspection of 38 BPs |
- |
- |
2003-04 |
2 |
Joint construction of retaining wall of BP S 229(2) |
- |
- |
2004-05 |
3 |
Joint inspection of ironwork fencing |
S 81-2 |
S 83 |
2004-05 |
4 |
Joint inspection of ironwork fencing and unusal construction |
S78-1 |
S 79 |
2005-06 |
5 |
Joint inspection of 5 Nos drainage system |
Near S81 |
- |
2007-08 |
6 |
Joint inspection of changing of boundary river |
- |
- |
2007-08 |
7 |
Joint inspection of construction of rubber factory by China side |
S 144-2 |
S 144-3 |
2007-08 |
8 |
Joint inspection of stone retaining wall along the Moechae Chaung |
- |
- |
2008-09 |
9 |
Joint demarcation of boundaryline along the friendship tunnel |
Near S 4 |
- |
2009-10 |
10 |
Joint inspection of alluvial land of Namwam Chaung |
Near S 53-4 |
- |
2010-11 |
11 |
Joint inspection of stone retaining wall along the Moneko Chaung |
S 98-1 |
S 98-2 |
2010-11 |
12 |
Joint inspection of stone retaining wall along the Ngaw Chaung Hka Chaung |
Near S 22 (2) |
- |
2010-11 |
13 |
Joint inspection of reservoir by china side at the Moneko Chaung |
S 96 |
S 97 |
2010-11 |
14 |
Joint inspection of construction of retaining wall by Myanmar side |
Near S 53(4) |
- |
2010-11 |
15 |
Joint inspection of Boundary Line |
S 79-1 |
S79-2 |
2010-11 |
16 |
Joint demarcation of boundry marker in the friendship tunnel |
Near S 4 |
- |
2010-11 |
17 |
Joint inspection of Boundary Line |
Near S 83 |
- |
2011-12 |
18 |
Joint inspection of retaining wall by China side along the Moneko Chaung |
Near S 97(1) |
- |
2011-12 |
19 |
Joint inspection of retaining wall by China side |
S 89-1(2) |
S 90(2) |
2011-12 |
20 |
Joint inspection of stone retaining wall along the Ngaw Chaung Hka Chaung |
Near S 22 (2) |
- |
2011-12 |
21 |
Joint inspection of construction of reservoir at the Moneko Chaung |
S 96 |
S 97 |
2011-12 |
22 |
Joint inspection of construction of retaining wall by China side |
S 89-1(2) |
S 90(2) |
2012-13 |
23 |
Joint surveying of reconstruction of S 200(1) at the original position |
- |
- |
2013-14 |
24 |
Joint inspection and surveying of reconstruction of S 200(1) at the original position |
- |
- |
2013-14 |