Myanmar - China Boundary

           Myanmar – China Boundary was demarcated during the year 1959 to 1961. It was known as “Ba Ba Campaign”. In 1985-1986 field season, first phase of joint inspection of Myanmar- China boundary was done for 106 boundary pillars and necessary Additional Boundary Pillars were constructed. Second phase of joint inspection of Myanmar- China boundary for 498 boundary pillars was done during 1993- 1994 field season. Ground Control Point surveying for the total length of 1384 miles of Myanmar – China entire boundary was carried out during the 1993-1994 field season and aerial photography, vectorization and map production were also carried out.

                       The Joint inspection and construction of Myanmar – China Boundary

Sr.

Categories

Location

Field season

From

To

1

Joint inspection of 38 BPs

-

-

2003-04

2

Joint construction of retaining wall of BP  S 229(2)

-

-

2004-05

3

Joint inspection of ironwork fencing

S 81-2

S 83

2004-05

4

Joint inspection of ironwork fencing and unusal construction

S78-1

S 79

2005-06

5

Joint inspection of 5 Nos drainage system 

Near S81

-

2007-08

6

Joint inspection of changing of boundary river

-

-

2007-08

7

Joint inspection of construction of rubber factory by China side

S 144-2

S 144-3

2007-08

8

Joint inspection of stone retaining wall along the Moechae Chaung

-

-

2008-09

9

Joint demarcation of boundaryline along the friendship tunnel

Near S 4

-

2009-10

10

Joint inspection of alluvial land of Namwam Chaung

Near S 53-4

-

2010-11

11

Joint inspection of stone retaining wall along the Moneko Chaung

S 98-1

S 98-2

2010-11

12

Joint inspection of stone retaining wall along the Ngaw Chaung Hka Chaung

Near S 22 (2)

-

2010-11

13

Joint inspection of reservoir by china side at the Moneko Chaung

S 96

S 97

2010-11

14

Joint inspection of construction of retaining wall by Myanmar side

Near S 53(4)

-

2010-11

15

Joint inspection of Boundary Line

S 79-1

S79-2

2010-11

16

Joint demarcation of boundry marker in the friendship tunnel

Near S 4

-

2010-11

17

Joint inspection of Boundary Line

Near S 83

-

2011-12

18

Joint inspection of retaining wall by China side along the Moneko Chaung

Near S 97(1)

-

2011-12

19

Joint inspection of retaining wall by China side

S 89-1(2)

S 90(2)

2011-12

20

Joint inspection of stone retaining wall along the Ngaw Chaung Hka Chaung

Near S 22 (2)

-

2011-12

21

Joint inspection of construction of reservoir at the Moneko Chaung

S 96

S 97

2011-12

22

Joint inspection of construction of retaining wall by China side

S 89-1(2)

S 90(2)

2012-13

23

Joint surveying of reconstruction of S 200(1) at the original position

-

-

2013-14

24

Joint inspection and surveying of reconstruction of S 200(1) at the original position

-

-

2013-14

 